Quantcast
Channel: Motorcycles Repair Manual Download and Reviews » Search Results » how to remove heat shield from yamaha vstar 650 2009 exhaust pipe
Viewing all articles
Browse latest Browse all 10

2007 Yamaha V-Star 1300 Classic Straights Installation Instructions

$
0
0

download
Stock Exhaust System Removal 1. Remove right side Foot peg assembly or Floorboard. (Whichever is applicable to your model.) 2. Remove bolts that are holding pipes at rear mounting bracket. 3. Loosen clamps at mufflers. 4. Remove mufflers. 5. Remove the two nuts that secure the rear exhaust header pipe to the rear cylinder head. 6. Remove rear exhaust pipe assembly. 7. Remove the two nuts that secure the front exhaust header pipe to the front cylinder head. 8. Remove front exhaust pipe assembly. 9. Remove exhaust-mounting bracket from frame. Hard-Krome Exhaust System Installation NOTE: Take care when fitting this Hard-Krome aftermarket exhaust system on your motorcycle. It has been designed to replace a STOCK exhaust system on a motorcycle with its engine, frame and other components in their STOCK design, configuration and location. WARNING : Re-check and re-tighten ALL fasteners and supports after 50 miles, then re-check and tighten as necessary on a periodic basis to ensure proper operation and performance. NOTE: All fasteners should be loose during initial installation to ensure proper fit and location of the new exhaust system. 1. Install new exhaust gaskets. 2. Install mounting bracket using Bolts with flat & lock washers. 3. Install Front exhaust header pipe, taking care to not scratch chrome surfaces on pipe, engine or motorcycle — use masking tape as needed. 4. Install the two nuts to secure the flange that holds the exhaust header pipe to the front cylinder head — DO NOT TIGHTEN NUTS! 5. Install Nut strip into each slotted bracket of front pipe and start the 3/8-16×3/4″ Bolt with flat & lock washer through backside of mounting bracket. — DO NOT TIGHTEN BOLTS! 6. Carefully install rear pipe. 7. Install the two nuts to secure the flange that holds the exhaust header pipe to the front cylinder head — DO NOT TIGHTEN NUTS! 8. Install Nut strip into each slotted bracket of rear pipe and start the 3/8-16×3/4″ Bolt with flat & lock washer through backside of mounting bracket. — DO NOT TIGHTEN BOLTS! 9. Tighten the two bolts that secure the rear exhaust header pipe flange. 10. Tighten the two bolts that secure the front exhaust header pipe flange. 11. Tighten front pipe bolts at mounting bracket. 12. Tighten rear pipe bolts at mounting bracket. 13. Reinstall foot peg assembly or floorboard. 14. If applicable to your model install foot peg relocating brackets and foot pegs as shown in illustration. 15. Before starting bike wipe off any fingerprints and grease off pipes. Start bike and check for any exhaust leaks. NOTE: To achieve optimum performance from your Hard-Krome exhaust system we suggest installing the Dynojet jet kit for carbureted models

Incoming search terms:


Viewing all articles
Browse latest Browse all 10

Latest Images

Trending Articles





Latest Images